Nos ingénieurs travaillent en anglais — les devis et les échanges techniques se font en anglais (serbe et macédonien également possibles).

Low volume assembly

The batch that is too small for the big shops.

Ten boards, a hundred, a thousand. Low volume is the work our line is set up for — five boards is the floor, no penalty for a batch that does not fill a shift, and a price at every quantity you want to compare.

Get your quoteHow we price

What low volume means here

Built for batches, not just for volume

Five boards is the minimum

We do not turn away a batch for being small. Five is the floor, and it exists so a two-board order is not priced below the cost of handling it.

Price at every break

Ask for three quantities on the form and the quote shows all three, so you can see exactly where the price steps down.

Scheduled call-offs

Running the same board every quarter? We quote the series once and release batches against it, so you hold less stock.

Setup stated separately

Setup and stencil appear as their own line rather than hidden in the unit price — that is what makes small batches honest to compare.

Repeat runs are cheaper

The second run of a board skips most of the setup. Tell us it is recurring and the quote reflects it.

Changes between runs

Revisions are normal in low volume. Send the new files and we requote what actually changed.

Typical batches

Where low volume sits

BatchTypical useWhat drives the price
1–10Prototype and validationSetup and parts, not labour
10–100Pilot run, field trialParts and placement labour
100–1,000Series productionParts, with labour amortized over the run
1,000+Volume productionParts and freight — ask us about scheduled delivery

The quantity you enter on the form drives the whole quote. Give us three and you can see the curve, not a point.

Low volume questions

Is there a minimum order quantity?

Five boards. That is the only floor, and it exists so a two-board order is not priced below the cost of handling it.

How much cheaper is 500 than 50?

Setup is spread over more boards and parts get cheaper per unit — see the worked examples on the pricing page.

Can you hold stock for scheduled deliveries?

Yes, for recurring builds. Tell us the forecast on the quote form and we will quote the series with call-offs.

What happens to leftover components?

They stay yours. We tell you what is left after the run and hold it for the next batch, or ship it with the boards.

Get a price at every quantity that matters.

Enter up to three quantities on the form and the quote shows all three.

Start your quote